Arconda Systems Logo
de-DEen-US
Clientl�sung Serverl�sung
Clientl�sung Serverl�sung
Prozessmanagement
Prozessmanagement
GMP Workflowmanager
GMP Workflowmanager

Aktuelles

03.06.2022

Annex to ED Decision 2022-006-R eControl content update now available

 

With the implementation of ED Decision 2022/006/R aims to maintain a high and uniform level of safety in terms of aerodrome design.The main changes concern:

the standardised naming of taxiways; 
location of holding bays, runway-holding positions, intermediate holding positions and road-holding positions; runway guard lights, no-entry bar, information signs.

The complete ED Decision 2022-006-R is now available as a content update for the eControl compliance management module.

 
15.12.2021

eControl not affected by Log4J vulnerability

 

We hereby inform our customers that eControl and its services do not contain any Java application components and are therefore not affected by the Log4J vulnerability. 

 
10.11.2021

New implementation of the SNOWTAM

 

In accordance with EUR DOC 041, the previous SNOWTAM form has been adopted to comply with the most recent ICAO requirements. As of now the SNOWTAM form has just had an informational purpose within econtrol. With the new change, the form now has also become available for mobile data entry within the eControl mobile Windows table application. The new SNOWTAM form comes as a one time purchase addon for the current installation.

 

 
26.10.2021

New EASA regulatory changes fully implemented within the eControl compliance management

 

Eversince the implementation of the Annex to ED Decision 2019/012/R there have been changes being released by EASA, which by now have been fully implemented within the eControl compliance management module.

Annex to ED Decision 2020/009/R
‘Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Authority, Organisation and Operations Requirements for Aerodromes — Issue 1, Amendment 3’

Released July, 15th 2020, this amendment features many changes to the RFFS GM and AMC documentation.

Annex to ED Decision 2020/021/R
Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Authority, Organisation and Operations Requirements for Aerodromes —
Issue 1, Amendment 4’

Released December, 15th 2020, this amendment has a strong focus on safety and training and qualification managment - two areas which can be fully covered by the corresponding eControl modules SMS and TQMS.

These new changes are available now for implementation in eControl aviation compliance managment upon request.

 
09.05.2018

New white paper: Company-wide compliance

 Maintaining compliance is a task that covers almost all areas of an airport. Therefore, an overall view and handling of the closely linked processes from the areas of safety, risk, environment, etc. is required. Requirements arising from Regulation (EU) 139/2014 and numerous other regulations and laws create a dynamic compliance environment that conventional systems do not meet or only meet with considerable additional effort.

In our current whitepaper "Company-wide compliance" we show you how compliance requirements can be mapped and updated across airport-departments with eControl and how compliance can be monitored and proven.

You can download the whitepaper as a PDF in our documents section.